Horonda Port
The dual-gauge intermodal gateway where European and Ukrainian rail meet: a Ready-to-Build terminal beside 35 ha of industrial land.
A prepared intermodal terminal at the EU border.
Horonda Port is a 13.8 ha multipurpose logistics terminal in Transcarpathia, planned with dual-gauge rail access, a bonded dry-port zone and direct adjacency to the wider Horonda industrial project.
Customs, storage and handling in one terminal product.
Customs, inspection, weighbridges, cross-dock, container and bulk storage are part of the product, not add-ons.
Ready-to-Build terminal status.
The terminal site, rail interface and service concept are defined. Detailed CAPEX, tariffs, corridor assumptions, permits and phasing move into partner diligence.
- Concept
- Feasibility
- Land
- Status & permits
- Design
- Ready-to-BuildRTB
Land, technical conditions, design, approvals & expertise and preliminary works are complete. The terminal stands at Ready-to-Build (RTB).
Operate the terminal.
For terminal operators, rail logistics groups and dry-port operators seeking a prepared industrial site in western Ukraine.
Anchor the volumes.
For cargo owners, importers, exporters, freight forwarders and 3PLs that need a reliable Ukraine-EU route.
Scale the asset.
For infrastructure capital reviewing the terminal, adjacent land, energy interface and phased development path.
Open the terminal diligence track.
Tell us whether you are evaluating terminal operations, cargo flows, storage services, infrastructure investment or a wider Horonda partnership. Qualified inquiries receive the terminal pack, the source documents, and a conversation with the founder.
Gateway layer for Horonda's logistics, park and energy project.